Skip to content

Frequently Asked Questions

A practical FAQ you can maintain directly from local configuration.

ProductHow long is the service life of a ROVELLC modular unit?

Under normal operation and maintenance, the primary structure is designed for approximately 30-50 years. Actual service life depends on configuration and climate.

ProcurementHow long does delivery and installation usually take?

Standard projects typically take 8-12 weeks, including production, logistics, on-site assembly, and commissioning.

ConstructionWhat are the foundation requirements?

Options include concrete foundation, steel base, pile foundation, or lightweight platform. Final selection depends on geotechnical data, load requirements, and local regulations.

ProductAre plumbing and electrical systems included?

Yes. Depending on model and package, units can include pre-installed water supply and drainage, electrical, lighting, HVAC, fresh air, and bathroom systems.

CustomizationCan interior layout and finishes be customized?

Yes. Common custom options include flooring, wall finishes, cabinetry, bathroom, kitchen, appliances, soft furnishings, and functional zoning.

Performance & SafetyCan the units adapt to extreme environments?

Yes. We can provide environment-specific upgrades such as anti-corrosion treatment, insulation packages, wind-resistant structure, and enhanced door-window systems.

After-SalesHow does warranty work?

Warranty terms are usually split by structure, MEP systems, and interior components. Final details are confirmed in the official contract and selected configuration.

PricingHow are shipping and installation costs calculated?

Shipping cost depends on destination port, route, and quantity. Installation cost depends on site conditions, lifting requirements, and foundation readiness.

ComplianceDo I need local permits?

In most regions, permits depend on use type, placement method, and local code. We can provide technical documents and support materials for submission.

ProductCan modules be relocated or expanded later?

Yes. Modular architecture supports relocation, capacity expansion, and phased deployment, subject to transport conditions and site constraints.

Still have questions?

Our team can provide project-specific recommendations based on your site and goals.

Contact Us